How to define system acceptance criteria
In preparation
We build content around the real IT service lifecycle: discovery, contracting, delivery, acceptance, and operations. Roles, assumptions, evidence, and accountability matter more than a list of technologies.
62
IT and technology portals
+31
portals for game development
12 mo.
indexation monitoring
IT and emerging technology
Portal matched to service model
Publication topic
How to structure discovery and define IT project boundaries
Portal database
The foundation is IT and technology portals. The additional 31 gaming sites are used for game production, engine development, graphics, audio, or interactive technology — not for any software house that ships a mobile app.
62
IT & technology sites
31
gaming sites (for game dev)
2
IT purchase paths
12 mo.
indexation monitoring

Portal selection criteria
We never select portals based on a single metric alone.
Collaboration paths
In a project engagement, the client is buying a controlled transition from the current state to an accepted solution. In a maintenance engagement, the client is buying the capacity to respond and keep the system running over time. A single 'end-to-end' promise does not describe both.
Path 01
Sample topics
Path 02
Sample topics
Packages
Scope depends on the number of services, engagement models, verticals, and ready-to-receive pages. We do not create separate articles by swapping the framework name within the same story.
Single Service
A campaign for one engagement model — such as discovery, integration, or maintenance — with a defined process and a ready-to-receive page.
Lower unit cost
Pricing after portal selection
Project and Operations
Coverage across preparation, delivery, acceptance, security, and maintenance — addressing multiple stakeholders in the buying process.
Lower unit cost
Pricing after portal selection
Competency Portfolio
A program for multiple services or markets, where each specialization has a dedicated team, documented evidence, a defined process, and a page ready to receive qualified inquiries.
Lower unit cost
Pricing after portal selection
How it works
Send your brief
Tell us about the site, niche, target market and campaign goal. We'll use that to scope the work.
Site selection & pricing
We match sites to your topic, audience and budget, then send a proposal for your approval.
Content & approval
You can supply a ready article or ask us to write one — either way you sign it off before we publish.
Publication & monitoring
Once approved, we publish and start monitoring indexation.
What's included
Before editorial work begins, we verify the delivery model, supporting evidence, and scope boundaries. After approval, we publish, report, and monitor indexation.
Send a brief for one client — we'll come back with a portal proposal, role breakdown, and a rough timeline.
Important for this industry
Jak pracujemy
Discovery, fixed-scope projects, time and material, and ongoing system maintenance have different buying processes and different target pages. We do not combine them in a single publication, nor do we select the same portal without first verifying the contract model.
A business sponsor choosing a project partner searches in different places than an IT manager responsible for system uptime and SLA compliance. We differentiate both the portals and the content topics for each stage — pre-delivery and post-launch.
Gaming sites are selected for game production, engine development, graphics, audio, and interactive technology. A mobile app or a project that happens to use Unity does not automatically qualify for gaming portals — we verify the target page and the client's actual scope.
An IT portal republishes the claims in an article. A case study without a time period, vendor role, and measurement method, or a security certificate without a specified system and validity date — these are details that should not reach publication without scope verification.

Answers covering discovery, fixed scope, T&M, estimation, case studies, security, NIS2, CRA, acceptance, SLA, and exit planning.
An IT company sells a project, a team, integration, or maintenance — each with an individually defined scope. SaaS offers a repeatable product with fixed plans. Estimation, acceptance, IP ownership, accountability, and exit terms are described differently in each case.
The output depends on the goal, but it may include a problem map, requirements, architecture, risk register, backlog, prototype, scope variants, and a decision plan. A list of meetings is not yet an accepted deliverable.
Not always. Fixed scope works when requirements are sufficiently stable and change management is clearly defined. T&M provides flexibility, but requires active backlog control, priority management, velocity tracking, budget oversight, and a capable product owner on the client side.
We state the scope, estimation method, level of requirements maturity, assumptions, uncertainty, dependencies, exclusions, and the date of the estimate. An estimate in an article is not a binding proposal for an unknown system.
A time period, a baseline, the objective, team composition, the client's role, technologies used, dependencies, measurement method, and explicit consent. The result must be attributable to the vendor's actual contribution.
No. You need to check the organization in scope, the specific service, location, system, validity period, and any exclusions listed in the certification. Configuration choices and client-side responsibilities continue to affect the security of the solution.
NIS2 imposes obligations on specific entities and covers risk management and incident reporting. It is not a vendor certification. Content must identify the company's role, the applicable jurisdiction, and the specific service that supports the client's compliance obligation.
The CRA applies to hardware and software products with digital elements placed on the EU market — not automatically to every IT service. Reporting obligations begin on 11 September 2026, and the main product requirements apply from 11 December 2027.
Data export, source code and repository access, account and key handover, documentation, knowledge transfer, licenses, subcontractor contracts, deletion of backup copies, transition support, timelines, and a defined completion criterion.
No. Detailed process content and verifiable evidence can improve how buyers evaluate a vendor, but they do not guarantee indexation, rankings, shortlisting, inbound inquiries, citations in AI tools, or project success.
Last updated: July 2026
Next step
Share your engagement models, delivery process, acceptance criteria, security documentation, maintenance terms, and service pages. We will map them to the questions your buyers are asking.
See also